Project Background

The Oregon Department of Transportation (ODOT) will be improving bike lanes, updating sidewalks and storm drainage along State Highway 219 aka N. College Street (See image below).   This  ODOT project, designed by Otak, Inc., includes bike lanes on both sides of the highway, sidewalks on the west side where there are gaps, planter strips where feasible, curb ramps compliant with American with Disabilities Act (ADA), and improved stormwater drainage. 

The Project information can be viewed on their website HERE.

The ODOT project required City of Newberg to relocate underground waterline to prevent conflicts.  See N College Street Waterline & Valve Insertion Project for details of the City’s part of this project.

Schedule: This ODOT schedule is subject to change 

  • Jul 2018–Jul 2022: Design Phase
  • Aug-Nov 2022: Bid Phase
  • Jan - Sept 2024: Construction Phase (Revised April 2023)
N College Waterline Project diagram
Status Updates

An Update on the ODOT Sidewalk and Bike Lane Project - updated 9/12/23

The ODOT contractor, The Saunders Company, is performing tree removal on several properties along N College Street this week in anticipation of the construction of bike lanes and sidewalks in 2024. Please refer to the following link for details on the ODOT project:

https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=....

ODOT Construction Manager William Ness, PE will answer any related questions on this ODOT project. William, or Bill, can be reached via email at william.ness@odot.state.or.us. ODOT's consultant, OTAK, Inc. (Mandy Flett and her team) provides project inspections for ODOT. City's Senior Engineer Paul Chiu, PE works with ODOT and OTAK for coordination purposes. Paul can be reached via email at paul.chiu@newbergoregon.gov.

An Update on the ODOT Sidewalk and Bike Lane Project - updated 5/16/23

The ODOT construction project is now anticipated to begin in early 2024. Please refer to the following link for details on the ODOT project: https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18749.

ODOT Project Liaison, Brennan Burbank, PE, OPMA is stepping away from this project as ODOT Construction Manager William Ness, PE steps in for the construction phase of this ODOT project. William can be reached via email at william.ness@odot.state.or.us. City's Senior Engineer Paul Chiu, PE will be working with ODOT for coordination purposes. Paul can be reached via email at paul.chiu@newbergoregon.gov.

Update on ODOT's Construction Project - updated 4/3/23

On March 23, 2023, ODOT and the City of Newberg completed the signing of Amendment No. 3 for the Intergovernmental Agreement (IGA) No. 31704 by authority of Council Resolution 2023-3890. This IGA amendment provides an increase in construction funding for the ODOT Sidewalk and Bike Lane Project.

A preconstruction conference will be scheduled by ODOT construction manager William Ness, PE. William can be reached via email at william.ness@odot.state.or.us. City's Senior Engineer Paul Chiu, PE will be working with ODOT for coordination purpose. Paul can be reached via email at paul.chiu@newbergoregon.gov.

This ODOT project is anticipated to be a summer/fall construction project. Please refer to the ODOT website noted above for the ODOT project update.

ODOT A Few Steps to Construction Phase - updated 1/19/23

The ODOT Sidewalk and Bike Lane Project is several steps from the construction phase. Please refer to the ODOT website noted above for the project update.

ODOT Moving to Bid Phase - updated 9/1/22

The ODOT Sidewalk and Bike Lane Project will be in bid solicitation with bid closing planned for October 20, 2022 according to ODOT Project Liaison, Brennan Burbank.

Adequacy of matching funds from City of Newberg will depend on the responsive lowest bid received by ODOT on the ODOT project. If the total ODOT project costs, including the construction bid total, stay within the available ODOT budget, then there will be no need for the City to provide any additional matching funds to ODOT. We will wait and see.

Project Design in Final Phase for ODOT - updated 7/5/22

ODOT’s design consultant (OTAK, Inc.) is working on the final phase of the ODOT Sidewalk and Bike Lane Project with the intent for bid solicitation later this year. The ODOT project at its northern project limit will end at the E Edgewood Drive intersection.

Meanwhile, the City’s waterline project in the same area will be re-advertised for construction bids later this July and construction should be fully complete in March/April 2023 in advance of the ODOT project. More updates will be posted at this website when City staff receives them from ODOT.

Project Coordination in Progress to Eliminate Design Conflicts - updated 3/11/22

ODOT’s design consultant (OTAK, Inc.) and Newberg's waterline design consultant (Murraysmith, Inc.) are coordinating their design with each other to eliminate design conflicts. The City’s waterline project will be advertised for construction bids in April/May 2022 and be fully complete in this calendar year in advance of the ODOT project.

OTAK Performing Final Design for ODOT - updated 7/26/21

ODOT's consultant, OTAK, Inc. will be performing the final design for bid solicitation in the fall of 2022 and construction in 2023. All dates are tentative and subject to change by ODOT.

Project History

December 2014 Oregon Transportation Commission (OTC) incorporated this project into its Statewide Transportation Improvement Program (STIP).
July 2017 Newberg City Council adopted Resolution 2017-3389 authorizing the signing of Intergovernmental Agreement (IGA) No. 31704 and providing the City’s matching funds for this project.

July 2021

Newberg City Council adopted Resolutions 2021-3721 and 2021-3751 authorizing an amendment to IGA No. 31704 and signing IGA No. 32487 for the associated right-of-way services.