Erosion & Sedimentation Control

This application is to be used if you are disturbing more than 500 square feet of soil.

All projects, regardless of size,  located in floodplain, stream corridor, or that have the potential to discharge stormwater offsite that will exceed state and federal water quality limits are required to install ESC measures. In addition, construction materials must be properly stored and handled during the project and the project must follow proper disposal procedures of all construction waste.

Fill out your Permit application through the our online permitting software eTRAKiT at https://trakit.newbergoregon.gov/etrakit/

If you have any questions, please call 503-537-1273.

If you are disturbing more than 1-acre of soil a 1200-C Construction Stormwater General Permit will also be required from the State of Oregon, Department of Environmental Quality (DEQ).