Street Preservation

City of Newberg Public Works Department maintains and operates approximately 70 centerline miles of local, collector, and arterial streets. Approximately 65 centerline miles of the existing street system is constructed of asphalt concrete, with the remainder being gravel roads and portland cement concrete. The City has a  desire to establish  the current condition of the pavement surface and establish a maintenance and rehabilitation plan for the next seven years. 

See attached map that shows the survey results of the pavement conditions in 2014.

Click any thumbnail image to view a slideshow

Classification of Pavement Conditions
Types of Pavement Maintenance
Types of Pavement Rehab
General Pavement Maintenance Guidelines
Pavement Condition Index
Pavement Maintenance Guidelines
2014 Pavement Analysis Funding Level Options
Existing Revenue Sources
Local Transportation Funding Mechanisms