FEE WORKSHEET
Fee Worksheet
A link to the fee worksheet is provided to assist is assessing the City fees.If you have any questions, please contact us.
- permits@newbergoregon.gov
- 503-537-1240
- 414 E First Street, Newberg OR, 97132
SAMPLE FEES
New Single-Family Residence - Scenario
- 2,600 sq. ft. 2 story house
- 1 kitchen
- 3 bathrooms (24 fixture units)
- 500 sq. ft garage
- 500 sq. ft. deck
- 3/4" meter
- Corner lot with 750 sq. ft. of driveway and sidewalk including an ADA ramp
| Building | |
| Plumbing | |
| Mechanical | |
| Engineering | |
| Third Party - Newberg School District CET | |
| Third Party - Chehalem Parks Development (CPRD) | |
| Third Party - Yamhill County Electrical | |
| Total Permit Fees |
New Manufactured Home on a Private Lot - Scenario
- 1,400 sq. ft.manufactured home
- 240 sq. ft. carport
- 150 sq. ft. deck with no cover
- 750 sq. ft. of street frontage to also include an ADA ramp
- 18 fixture units
| Building | |
| Plumbing | |
| Mechanical | |
| Engineering | |
| Third Party - Newberg School District CET | |
| Third Party - Chehalem Parks Development (CPRD) | |
| Third Party - Yamhill County Electrical | |
| Total Permit Fees |
New Manufactured Home in a Park - Scenario
- 1,400 sq. ft. manufactured home
- 240 sq. ft. carport
- 150 sq. ft. deck with no cover
- Fees may vary.......
| Building | |
| Plumbing | |
| Mechanical | |
| Engineering | |
| Third Party - Newberg School District CET | |
| Third Party - Chehalem Parks Development (CPRD) | |
| Third Party - Yamhill County Electrical | |
| Total Permit Fees |
BUILDING
Building
| PERMIT TYPE | FEE |
Building Permit - to include but not limited to:
|
Based on the Valuation |
Building Permit
|
$111.14 flat fee - Solar Prescriptive $111.14 first hour, fraction thereof each 1/4 hour, minimum of 1 hour - Occupancy Change No grading permit Issued by Building |
Plan Review
|
85% of the building permit fee $111.14 first hour, fraction thereof each 1/4 hour, minimum of 1 hour |
| Community Development | 0.75% of the project valuation |
| Fire Life and Safety Plan Review | 60% of the building permit fee, excludes residential |
| State Surcharge | 12% of the building permit Fee |
| Technology | 5% of the permit amount |
Third Party
|
$1.?? per sq. ft. - Residential .?? per sq. ft. - subject to a cap of $25,000 - Non Residential |
Third Party
|
$9,389 - Single Family $8,269 - Multi Family, per unit $6,454 - Manufactured Home (in a park & elsewhere) $3,518 - ADU |
Third Party
|
All Electrical permits are issued through Yamhill County |
| Notes: Community Development
|
|
Revision / Deferred / ASI / RFI
| PERMIT TYPE | FEE |
| Revision | $111.14 first hour, fraction thereof each 1/4 hour, minimum of 1 hour |
| Deferred | $287.35 for each deferred or 10% of the permit fee for the value of the deferred work, whichever is greater |
| ASI (architect supplemental instruction) | $111.14 first hour, fraction thereof each 1/4 hour, minimum of 1 hour |
| RFI (request for information) | $111.14 first hour, fraction thereof each 1/4 hour, minimum of 1 hour |
| Technology | 12% of the building permit Fee |
| Note If additional value, mechanical or plumbing items are added, additional fees will be assessed
|
|
Phased Permits
| PERMIT TYPE | FEE | ||
| Phase 1 - Foundation Phase 2 - Building Shell Phase 3 - Completion Site Utilities are not part of the phased program |
$348.74 plus 10% of the building permit fee with a maximum of $1,500 excluding phase 1 see plumbing fees - Site Utilities |
||
| Phased Plan Review | 85% of the building permit fee - building plan review | ||
| Fire Life and Safety Plan Review | 60% of the building permit fee, excludes residential | ||
| Community Development | 0.75% of the project valuation | ||
| State Surcharge | Not Applicable | ||
| Technology | 5% of the permit amount | ||
| Notes: Phased Permits
|
|||
Mechanical - Residential
| PERMIT TYPE | FEE |
| Air Handler | |
| 1-10K CFM | $20.46 |
| 10K CFM and Greater | $27.40 |
| Appliance Vents / Air Ducts | $15.21 |
| Mini-Split | $20.46 |
| Boilers / Compressors / Absorption Systems | |
| 1 - 100K BTU | $25.66 |
| 101K - 500K BTU | $41.62 |
| 501K - 1000K BTU | $56.96 |
| 1001K - 1750K BTU | $83.05 |
| 1750K BTU and Greater | $135.24 |
| Air Conditioner | $27.40 |
| Evaporative Coolers | |
| Evaporative Coolers | $27.40 |
| Furnace | |
| FAU / Gravity Furnace that is less than 100K BTU | $27.40 |
| FAU / Gravity Furnace that is greater than 100K BTU | $27.40 |
| Wall / Floor / Suspended / Mounted | $27.40 |
| Gas Piping | |
| Gas Pipe Outlet 1 - 4 | $18.70 |
| Each Outlet over 4 | $8.25 |
| Incinerator | |
| Incinerator - Domestic | $30.89 |
| Incinerator - Commercial / Industrial / Government | based on mechanical valuation |
| Minimum Fee | |
| Minimum Fee is Charged Unless the Calculated Fee is Greater | $111.14 |
| Miscellaneous | |
| Miscellaneous / Clothes Dryer / Water Heater / Etc. | $20.46 |
| Type I Hood | based on mechanical valuation |
| Other Heating Units | |
| Wood / Fireplace / Masonry / Factory Built | $44.80 |
| Room Heaters, Non-Portable | $27.40 |
| Ventilation and Exhaust | |
| Ventilation Fan - Single Duct | $15.21 |
| Ventilation System | $20.46 |
| Exhaust Hoods | $20.46 |
| Mechanical Plan Review | 50% of the mechanical permit fee |
| Mechanical State Surcharge | 12% of the plumbing permit fee |
| Mechanical Technology | 5% of the mechanical permit fee |
| Notes: State Surcharge
|
|
Mechanical - Commercial
| VALUATION TABLE | FEE |
| $1 - $2,000 | $111.14 |
| $2,001 - $5,000 | $111.14 for the first $2,000 and $2.30 for each additional $100 or fraction thereof, to and including $5,000 |
| $5,001 - $10,000 | $180.14 for the first $5,000 and $1.80 for each additional $100 or fraction thereof, to and including $10,000 |
| $10,001 - $50,000 | $270.14 for the first $10,000 and $1.50 for each additional $100 or fraction thereof, to and including $50,000 |
| $50,001 - $100,000 | $870.14 for the first $50,000 and $1.25 for each additional $100 or fraction thereof, to and including $100,000 |
| $100,001 and above | $1,495.14 for the first $100,000 and $1.10 for each additional $100 or fraction thereof |
| Mechanical Plan Review | |
| State Surcharge | 12% of the building permit Fee |
| Technology | 5% of the permit amount |
| Notes: State Surcharge
|
|
Plumbing Fees
| PERMIT TYPE | FEE |
| 1 & 2 Family New | |
| 1 Bath | $269.57 |
| 2 Bath | $356.54 |
| 3 Bath | $443.52 |
| Each Additional Bath or Kitchen | $111.14 |
| 1 & 2 Family Alteration / Interior Re-pipe Per Fixtures Affected | |
| Per Fixture | $26.11 |
| 1 & 2 Family Fire Sprinkler System - Multipurpose / is part of the plumbing system | |
| 0 - 2,000 sq. ft. | $111.14 |
| 2,001 - 3,600 sq. ft. | 148.16 |
| 3,601 sq. ft - 7,200 sq. ft. | 185.22 |
| 7,201 sq. ft. and above | 259.30 |
| 1 & 2 Family Rain Drains | |
| Down Spouts | 111.14 |
| Commercial / Industrial / Government | |
| Per Fixture | $26.11 |
| Medical Gas - Valuation Table | |
| $1 - $25,000 | $349.48 |
| $25,001 - $50,000 | $349.48 for the first $25,000 + $5.85 for each additional $1,000 or fraction thereof, to and including $50,000 |
| $50,001 - $100,000 | $495.73 for the first $50,000 + $3.90 for each additional $1,000 or fraction thereof, to and including $100,000 |
| $100,001 and above | $690.73 for the first $100,000 + $3.25 for each additional $1,000 or fraction thereof |
| Exterior Sewer / Storm / Water | |
| Sewer - Exterior | $111.14 first 100 ft and $43.50 each additional |
| Storm - Exterior | $111.14 first 100 ft and $43.50 each additional |
| Water - Exterior | $111.14 first 100 ft and $43.50 each additional |
| Minimum | |
| Minimum fee is charged unless the calculated is greater | $111.14 |
| Miscellaneous | |
| Alternative Water Heating | $111.14 |
| Backflow Device | $111.14 |
| Plumbing Plan Review | 50% of the Plumbing Permit Fee |
| Plumbing State Surcharge | 12% of the Plumbing Permit Fee |
| Plumbing Technology | 5% of the Permit Amount |
| Note: State Surcharge
Technology
|
|
Manufactured Home
The fee Includes the following:
- Concrete slab, runners, or foundation when prescriptive.
- Garage, carport, deck (over 30 inches), stairs (over 30 inches), shed (over 200 sq. ft.), or plumbing for sewer, water, and rain drains (over 30 ft).
- A separate permit would be required.
| FEE TYPE | FEE |
| Permit | |
| Base Permit | $818.44 |
| State Surcharge | |
| Manufactured Home State Admin - flat fee | $30.00 |
| Manufactured Home State Surcharge - 12% | $98.21 |
| Technology | |
| Technology - 5% of the base permit | $40.92 |
| Third Party | |
| Newberg School District Construction Excise Tax | $1.?? per sq. ft. of new residential construction |
| Chehalem Park and Recreation | $???? |
| ENG FEES | ????? |
| Note Applicable only for new manufactured home placement, does not include replacement of a manufactured home. |
|
Manufactured Home Placed in a Park
| FEE TYPE | FEE |
| Permit | |
| Base Fee | |
| State Surcharge | |
| Manufactured Home State Admin - flat fee | |
| Manufactured Home State Surcharge - 12% | |
| Technology | |
| Technology 5% of the base permit | |
| Third Party | |
| Newberg School District Construction Excise Tax | |
|
|
New Manufactured Park
Formula for a new manufactured dwelling park permit and plan review fee.- Square Feet of a area being developed ÷ 43,560 (43,560=1acre)
- Number of spaces ÷ number of acres = valuation in Table 2
- Valuation in Table 2 x Number of spaces = permit fee in Table 1
- The permit fee is taken from Table1
- The Plan Review Fee is 85% of the permit fee
- The State Surcharge is 12% of the permit fee
- The Technology fee is 5% of the permit and plan review
- FLS?????
| Manufactured Dwelling Park Permit Fee - Table 1 | FEE |
| $1 - $500 | $15.00 |
| $501 - $2,000 | $15.00 for the first $500 plus $2.00 for each additional $100 or fraction thereof, to and including $2,000 |
| $2,001 - $25,000 | $45.00 for the first $2,000 plus $9.00 for each additional $100 or fraction thereof, to and including $25,000 |
| $25,001 - $50,000 | $252.00 for the first $25,000 plus $6.50 for each additional $100 or fraction thereof, to and including $50,000 |
| $50,001 - $100,000 | $414.50 for the first $50,000 plus $4.50 for each additional $100 or fraction thereof, to and including $100,000 |
| $100,001 - $500,000 | $639.50 for the first $100,000 plus $3.50 for each additional $100 or fraction thereof, to and including $500,000 |
| $500,001 - $1,000,000 | $2,039.50 for the first $500,000 plus $2.00 for each additional $100 or fraction thereof, to and including $1,000,000 |
| $1,000,000 and above | $3,039.50 for the first $1,000,000 plus $2.00 for each additional $100 or fraction thereof |
| MANUFACTURED DWELLING PARK VALUATION FEE - TABLE 21 |
|||||||||
| Spaces Per Acre |
|||||||||
| Park Class |
4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| A |
23,956.42 | 22,397.47 | 21,098.37 | 20,059.09 | 19,019.77 | 18,240.31 | 17,720.67 | 17,421.51 | 17,201,05 |
| B | 22,344.70 | 21,211,25 | 19,486.67 | 18,447.36 | 17,408.09 | 16,628.61 | 16,108.99 | 15,849.15 | 15,443.18 |
| C | 21,555.39 | 20,412.26 | 18,707.21 | 17,667.89 | 17,330.94 | 15,849.15 | 15,329.51 | 15,069.67 | 14,809.83 |
New Recreational Park
Formula for Recreational Park Permit and Plan Review Fee:
- Square Feet of area being developed ÷ 43,560 (43,560=1acre)
- Number of spaces ÷ number of acres = valuation in Table 2
- Valuation in Table 2 x Number of spaces = permit fee in Table 1
- The permit Fee is taken from Table 1
- The Plan Review Fee is 85% of the permit fee
- The State Surcharge Fee is 12% of the permit fee
- The Technology Fee is 5% of the permit and plan review fees
- FLS???
| RECREATIONAL PARK PERMIT FEE - TABLE 1 | FEE |
| $1 - $500 | $15.00 |
| $501 - $2,000 | $15.00 for the first $500 plus $2.00 for each additional $100 or fraction thereof, to and including $2,000 |
| $2,001 - $25,000 | $45.00 for the first $2,000 plus $9.00 for each additional $1,000 or fraction thereof, to and including $25,000 |
| $25,001 - $50,000 | 252.00 for the first $25,000 plus $6.50 for each additional $1,000 or fraction thereof, to and including $50,000 |
| $50,001 - $100,000 | 414.50 for the first $50,000 plus $4.50 for each additional $1,000 or fraction thereof, to and including $100,000 |
| $100,001 - $500,000 | $639.50 for the first $100,000 plus $3.50 for each additional $1,000 or fraction thereof, to and including $500,000 |
| $500,001 - $1,000,000 | $2039.50 for the first $500,000 plus $2.00 for each additional $1,000 or fraction thereof, to and including $1,000,000 |
| $1,000,001 and above | $3,039.50 for the first $1,000,000 plus $2.00 for each additional $1,000 or fraction thereof |
| RECREATIONAL PARK VALUATION FEE1 - TABLE 2 | |||||||||
| Spaces Per Acre | |||||||||
| Park Class | 6 | 8 | 10 | 12 | 14 | 16 | 18 | 20 | 22 |
| A | 2,637 | 2,470 | 2,320 | 2,189 | 2,074 | 1,978 | 1,907 | 1,849 | 1,798 |
| B | 2,483 | 2,317 | 2,176 | 2,035 | 1,920 | 1,824 | 1,754 | 1,696 | 1,645 |
| C | 1,792 | 1,626 | 1,485 | 1,344 | 1,229 | 1,133 | 1,062 | 1,005 | 954 |
Building Valuation Table
| VALUATION TABLE | FEE |
| $1 - $500 | $111.14 |
| $501 - $2,000 | $111.14 for the first $500 plus $1.50 for each additional $100 or fraction thereof, to and including $2,000 |
| $2,001 - $25,000 | $133.64 for the first $2,000 plus $7.80 for each additional $1000 or fraction thereof, to and including $25,000 |
| $25,001 - $50,000 | $313.04 for the first $25,000 plus $5.85 for each additional $1000 or fraction thereof, to and including $50,000 |
| $50,001 - $100,000 | $459.29 for the first $50,000 plus $3.90 for each additional $1000 or fraction thereof, to and including $100,000 |
| $100,001 and Above | $654.29 for the first $100,000 plus $3.25 for each additional $1000 or fraction thereof |
Square Foot Construction Cost Table
| Group | International Building Code | Type of Construction | ||||||||
| IA | IB | IIA | IIB | IIIA | IIIB | IV | VA | VB | ||
| A-1 | Assembly, Theaters, with Stage | 357.33 | 344.89 | 333.96 | 321.01 | 300.49 | 291.98 | 310.03 | 280.47 | 269.61 |
| A-1 | Assembly, Theaters, without Stage | 328.57 | 316.12 | 305.20 | 292.25 | 271.49 | 262.97 | 281.27 | 251.46 | 240.61 |
| A-2 | Assembly, Nightclubs | 277.44 | 269.30 | 260.84 | 250.89 | 234.99 | 228.61 | 242.28 | 213.69 | 205.58 |
| A-2 | Assembly, Restaurants, Bars, Banques Halls | 276.44 | 268.30 | 258.84 | 249.89 | 232.99 | 227.61 | 241.28 | 211.69 | 204.58 |
| A-3 | Assembly, Churches | 331.74 | 319.29 | 308.36 | 295.42 | 275.14 | 266.62 | 284.43 | 255.12 | 244.26 |
| A-3 | Assembly, General, Community Halls, Libraries, Museums | 276.12 | 263.67 | 251.75 | 239.80 | 218.28 | 210.76 | 228.82 | 198.26 | 188.40 |
| A-4 | Assembly | 327.57 | 315.12 | 303.20 | 291.25 | 269.49 | 261.97 | 280.27 | 249.46 | 239.61 |
| B | Business | 309.01 | 297.89 | 287.04 | 274.77 | 250.17 | 241.34 | 264.17 | 223.59 | 213.27 |
| E | Educational | 296.02 | 285.47 | 275.84 | 264.24 | 245.34 | 232.84 | 255.15 | 214.74 | 207.79 |
| F-1 | Factory and Industrial, Moderate Hazard | 169.11 | 160.95 | 150.84 | 143.13 | 129.25 | 122.95 | 138.37 | 107.18 | 99.77 |
| F-2 | Factory and Industrial, Low Hazard | 168.11 | 159.95 | 150.84 | 144.13 | 129.25 | 121.95 | 137.37 | 107.18 | 98.77 |
| H-1 | High Hazard, Explosives | 157.75 | 149.59 | 140.48 | 133.77 | 119.20 | 111.90 | 127.00 | 97.13 | N.P. |
| H234 | High Hazard | 157.75 | 149.59 | 140.48 | 133.77 | 119.20 | 111.90 | 127.00 | 97.13 | 88.73 |
| H-5 | HPM | 309.01 | 297.89 | 287.04 | 274.77 | 250.17 | 241.34 | 264.17 | 223.59 | 213.27 |
| I-1 | Institutional, Supervised Environment | 283.25 | 273.10 | 263.35 | 253.39 | 231.93 | 225.70 | 252.86 | 208.88 | 201.43 |
| I-2 | Institutional, Hospitals | 485.04 | 473.91 | 463.07 | 450.80 | 425.24 | N.P. | 440.20 | 398.66 | N.P. |
| I-2 | Institutional, Nursing Homes | 334.61 | 323.48 | 312.64 | 300.37 | 277.75 | N.P. | 289.77 | 251.17 | N.P. |
| I-3 | Institutional, Restrained | 325.77 | 314.64 | 303.80 | 291.53 | 269.89 | 260.06 | 280.93 | 263.64 | 230.99 |
| I-4 | Institutional, Day Care Facilities | 283.25 | 273.10 | 263.35 | 253.39 | 231.93 | 225.70 | 252.86 | 208.88 | 201.43 |
| M | Mercantile | 207.08 | 198.94 | 189.48 | 180.53 | 164.30 | 158.91 | 171.92 | 143.00 | 135.89 |
| R-1 | Residential, Hotels | 286.53 | 276.38 | 266.63 | 256.68 | 234.71 | 228.48 | 256.15 | 211.66 | 204.20 |
| R-2 | Residential, Multiple Family | 239.24 | 229.09 | 219.34 | 209.38 | 188.69 | 182.45 | 208.85 | 165.63 | 158.18 |
| R-3 | Residential, One and Two Family d | 224.62 | 218.65 | 213.40 | 208.84 | 301.86 | 194.67 | 213.06 | 187.70 | 175.92 |
| R-4 | Residential, Care / Assisted Living Facilities | 283.25 | 273.10 | 263.35 | 253.39 | 231.93 | 225.70 | 252.86 | 208.88 | 201.43 |
| S-1 | Storage, Moderate Hazard | 156.75 | 148.59 | 138.48 | 132.77 | 117.20 | 110.90 | 126.00 | 95.13 | 87.73 |
| S-2 | Storage, Low Hazard | 155.75 | 147.59 | 138.48 | 131.77 | 117.20 | 109.90 | 125.00 | 95.13 | 86.73 |
| U | Utility, Miscellaneous | 125.18 | 118.05 | 109.33 | 104.91 | 93.46 | 87.55 | 99.89 | 74.38 | 71.07 |
a. Private Garages use Utility, Miscellaneous
b. For Shell only Buildings Deduct 20 Percent
c. N.P. = Not Permitted
d. Unfinished Basements (Group R-3) = $31.50 Per Square Foot
Inspection Fees
| INSPECTIONS | FEE |
| Inspections for which No Fee is Specifically Indicated | $111.14 first hour, fraction thereof each 1/4 hour, minimum of 1 hour |
| Inspection Outside of Normal Business Hours | $111.14 per hour, minimum of 2 hours |
| Investigation Fee | $111.14 per hour, minimum 1/4 hour |
| Reinspection Fee | $111.14 each |
| Reinstatement Fee | $111.14 each |
PLANNING
TYPE I Application (Administrative Review)
5%Technology Fee Will Be Added to Total Fees (Resolution No. 2016-3268)
| APPLICATION | FEE |
| Any Type I Action Not Specifically Listed In This Section | $219 |
| ADU Design Review | $219 |
| Cottage Cluster Design-Review | $440 |
| Property Consolidation | $219 |
| Code Adjustment | $550 |
| Design-Review-(Duplex or commercial / Industrial Minor Addition Review) | 0.3% of Project Value, $550 Minimum |
| Minor Modification or Extension of Type I Decision | $219 |
| Major Modification of Type I Decision | 50% of Original Fee |
| Partition Final Plat | $1,107 Plus $94 Per Parcel |
| Property Line Adjustment | $1,107 |
| Sign Review | $95 + $1.00 Per Sq. Ft of Sign Face, $200 Max |
| Subdivision, PUD, or Condominium Final Plat | $2,219 Plus $94 Per Lot or Unit |
| Historic Landmark Minor Alteration / Demolition | $0 |
Type II Application (Land Use Decision)
5%Technology Fee Will Be Added to Total Fees (Resolution No. 2016-3268)
| APPLICATION | FEE |
| Other - Any Type II Action Not Specifically Listed in This Section | $1,107 |
| Minor Modification or Extension of Type II Decision | $219 |
| Major Modification of Type II Decision | 50% of Original Fee |
| Design Review (Including Mobile / Manufactured Home Parks) | 0.6% of Total Project Cost, $1,107 Minimum |
| Partition - Preliminary Plat | $1,107 Plus $94 Per Parcel |
| Middle Housing Land Division | $1,107 Plus $94 Per Parcel |
| Subdivision Preliminary Plat | $2,219 Plus $94 Per Lot or Unit |
| Variance | $1,107 |
| Vacation Rental Review | $1,107 |
Type III Application (Quasi-Judicial Review)
5%Technology Fee Will Be Added to Total Fees (Resolution No. 2016-3268)
| APPLICATION | FEE |
| Other - Any Type III Action Not Specifically Listed in This Section | $2,351 |
| Annexation | $3091 PLUS $293 Per Acre |
| Comprehensive Plan Amendment (Site Specific) | $2.897 |
| Conditional Use Permit | $2,351 |
| Minor Modification or Extension of Type III Decision, | $219 |
| Major Modification of Type III Decision | 50% of Original Fee |
| Historic Landmark Establishment or Modification | $0 |
| Historic Landmark Elimination | $2,696 |
| Subdivision Preliminary Plat | $2,219 Plus $94 Per Lot |
| Planned Unit Development | $4,697 Plus $94 Per Unit / Lot |
| Zoning Amendment (Site Specific) | $2,929 |
Type IV Application (Legislative Amendment)
5%Technology Fee Will Be Added to Total Fees (Resolution No. 2016-3268)
| APPLICATION | FEE |
| Comprehensive Plan Text Amendment or Large Scale Map Revision | $3,331.00 |
| Development Code test Amendment or Large Scale Map Revision | $3,331.00 |
Appeals Application
5%Technology Fee Will Be Added to Total Fees (Resolution No. 2016-3268)
| APPLICATION | FEE |
| Type I or II Appeal to Planning Commission | $634.00 |
| Type I or II Appeal to City Council | $1,150.00 |
| Type III Appeal to City Council | $1,351.00 |
| Type I Adjustments or Type II Variances that are not Designed to Regulate the Physical Characteristics of a Use Permitted Outright | $354.00 |
| Exhibitor License Fee Appeal to the City Council | 50% of Exhibtor License Fee |
Other Fees
5%Technology Fee Will Be Added to Total Fees (Resolution No. 2016-3268)
| APPLICATION/FEE TYPE | FEE |
| Expedited Land Division | $8,255 Plus $94 Per Lot or Unit |
| Fee-in-Lieu of Parking Program | $17,726.00 |
| Pre-Application Review | $100 |
| Trees in Public Right-of-Way Removal Permit | $10.00 |
| Technology Fee (This Fee will be Added to all Planning, Engineering and Building Fees. This does not Apply to System Development Charges) | 5% of Permit Amount |
| Urban Growth Boundary Amendment | $5,274.00 |
| Vacation of Public Right-of-Way | $2,188.00 |
| Vertical Housing Development Zone Fees | $600.00 Certification and Application Fee $400.00 Annual Monitoring Fee |
Land Use Review Fees (Development Engineering)
5%Technology Fee Will Be Added to Total Fees (Resolution No. 2016-3268)
| REVIEW TYPE | BASE FEE | ADDITIONAL FEE | PER LOT/ACRE FEE |
| Planning Design Reviews, Partitions, Subdivisions, Type II and II Planned Unit Developments, and MHLD | $360.14 2-19 Lots |
$16.00 | Lot After 19 |
| Final Plat Review, Partition and Subdivision and MHLD | $360.14 | $9.05 | Each Lot |
| Development Review for Public Improvements on Commercial, Industrial, Institutional Zone, and Multifamily Developments | $503.66 | $287.69 | Additional First Acre |
Business Licenses and Permits
5%Technology Fee Will Be Added to Total Fees (Resolution No. 2016-3268)
| BUSINESS LICENSES / PERMITS | FEE |
| LICENSES | |
| General Business License | $50.00 Per Year |
| Home Occupation Business License | $25.00 Per Year |
| Peddler / Street Vender Business License | $25.00 Per 6 Months Only |
| Perpetual Temporary Merchant in Operations More than 45 Days License | $75.00 Per Year |
| Exhibitor License | $160.00 |
| PERMITS | |
| Temporary Merchant in Operations from 4 to 45 Days Permit | $129.00 One Time Fee |
| Temporary Merchant in Operations More than 45 Days Permit | $437.00 One Time Fee |
| Solicitor Permit | $0 No Additional Fees |
ENGINEERING
Engineering
| FEE TYPE | FEE |
| SYSTEM DEVELOPMENT CHARGES2 | |
| Wastewater Development1 | |
| For the first 18 fixture units | $5,587.00 |
| Per each fixture unit over 18 | $310.39 |
| FEE TYPE | FEE | FEE |
| SYSTEM DEVELOPMENT CHARGES2 |
||
| Water Development1 | Potable | Not Potable |
| 3/4" Meter | $7,846.12 | $4,066.00 |
| 1" Meter | $13,338.40 | $6.912.20 |
| 1.25" Meter | $19,615.30 | $10,165.00 |
| 1.5" Meter | $25,892.19 | $13,417.80 |
| 2" Meter | $41.584.43 | $21.549.80 |
| 3" Meter | $78,461.19 | $40,659.99 |
| 4" Meter | $131,030.19 | $67,092.19 |
| 6" Meter | $258,921.94 | $134.177.98 |
| 8" Meter | $415,844.32 | $215.497.97 |
| PERMIT TYPE | FEE |
| Storm System Development1 | |
| Single Family - Equivalent Dwelling Unit (EDU)1 | $629.57 Flat Fee |
| Other than Single Family | (Impervious Area / 2877) x $629.57 |
| Transportation Development1 | |
| Single Family / ADU / Duplex / Triplex / Quadplex / Cottage Cluster - Per | $6,645.78 |
| Multi Family - Per Unit | $4,365.37 |
| Manufactured Home - In a Park | $3,192.59 |
| Manufactured Home - Elsewhere | $6,645.78 |
| Commercial / Industrial | See Transportation SDC Calculation Formula in the |
| Wastewater Connection | Actual Cost |
| Water Connection | Actual Cost |
| PERMIT TYPE | BASE | ADDITIONAL | PER |
| Sidewalk or Driveway Approach Permit and Inspection | $36.92 | $0.35 | Square Feet |
| Public Street ADA Ramp Review and Inspection | $43.88 | N/A | Each Ramp |
| Erosion Control Plan Review and Inspection | |||
| 500 to 5000 Square Feet Disturbed | $215.25 | N/A | Each Permit |
| 5001 Square Feet to Less than 1 Acre Disturbed | $503.66 | N/A | Each Permit |
| Site Improvement | |||
| Public Improvement Site Development Permit | 5% | N/A | Public Construction Cost Estimate |
| Single Family House Site Plan Review, Stormwater Review and Engineering | $215.25 | N/A | Each Permit |
| Stormwater: Commercial / Industrial / Multi Family Private Facility Storm Drainage Plan Review and Final Inspection for Water Quality / Quality Facilities | $431.21 First Acre |
$107.96 Additional Develop Acre |
N/A |
| PERMIT TYPE | FEE |
| Signalization Fee - Single Family | $285.61 |
| Technology | 5% of the Permit Amount |
| Reinspection Fee | $72.45 |
| Demolition Permit | $111.14 Flat Fee - Complete Based on Building Value - Partial |
| Hardship Request | $287.69 |
| Utility Right of Way Non-Refundable Application | $500.00 |
| Right of Way, Easement Review | $260.14 |
| Subsurface Permit for Franchise | $125.25 |
| Stormwater Fee in Lieu - Private | $1.50/SF |
| Stormwater Fee in Lieu - Public | $2.00/SF |
| Note Technology
|
|
PUBLIC RECORD
Public Record Fees
| PUBLIC RECORD | FEES |
| Research Request | |
| General Records Research | $60.00 Per Hour |
| City Attorney Research | $404.00 Per Hour |
| Paper Copies and Prints | |
| Paper Copies and Prints Letter / Legal / Tabloid | $0.25 Per Page, Per Copy |
| Copies by Third Party | Actual Cost |
| Shipping and Handling | Actual Cost |
| Other Records | |
| City of Newberg Street Maps | $3.00 Each |
| Comprehensive Plan Map or Zoning Map | $15.00 Each |
| GIS / Large Custom Maps | $15.00 Per Map Plus $62.00 Per Hour Labor |
| Other City Recorder / Admin / Finance | |
| Notarization | $10.00 Per Action |
| Grant Writing Services | $50.00 Per Hour |
| NSF Returned Check | $25.00 |
| Notes: Research Requests
|
|
ELECTRICAL
Electrical
- Please contact Yamhill County Electrical for permitting assistance.
- Yamhill County does the plan reviews, issues the permits and inspects all of the electrical permits for the City of Newberg.
Fee Inflation Adjustment
Fee Inflation Adjustment
The City of Newberg fee inflation adjustments include:
- Recorder Fee Schedules
- Building Fee Schedules
- Engineering Fee Schedules
- Planning Fee Schedules
Third party fee inflation adjustments may include:
- Chehalem Park and Recreation
- Newberg School District Construction Excise Tax