This application is to be used if you are disturbing more than 500 square feet of soil.

All projects, regardless of size, located in floodplain, stream corridor, or that have the potential to discharge stormwater offsite that will exceed state and federal water quality limits are required to install ESC measures. In addition, construction materials must be properly stored and handled during the project and the project must follow proper disposal procedures of all construction waste. Refer to the City of Newberg Erosion & Sedimentation Control Manual for additional information

If you are disturbing between 500 square feet - one acre of soil, Fill out your Erosion & Sedimentation Control Permit Application through City online permitting software 

If you are disturbing more than 1-acre of soil 1200-C Construction Stormwater General Permit will also be required from the State of Oregon, Department of Environmental Quality (DEQ).