Permit Fees
Permit Fees

 

The permit fees document contains information on various departmental fees.  A fee worksheet can be found on the front page of the document to assist you in calculating fees.  A plan review fee is due at the time of submittal.

Fees included:

  • Building
  • Engineering - System Development Charges or SDC's
  • Planning - Land Use
  • Public Record

Please see the permit fees brochure below for details.

Permit fees are based on the issuance date.

 

image of water sprinklers and lawn

Backflow assemblies keep you, your family and our water safe.

The easiest way to keep you and your family safe from the potential hazards of backflow is to not create cross connections. However, if you do have a cross connection to a lawn sprinkler system, boiler, pool, water feature, have an approved backflow prevention assembly installed. After installation, have the backflow assembly tested by a State Certified Backflow assembly tester. This test is required each year in order to comply with state health and plumbing codes. 

blue print of plans

Submitting for a permit and sample plans

To submit a permit, provide the following items.  Click on the document below for more details. | Español

  • Permit application
  • 2 site plans
  • 2 sets of construction plans

- typically elevation, foundation, roof framing, wall section and floor plans are submitted

Manufactured building with well groomed lawn

Manufactured Building

A Permit is required to place a Manufactured Building. 

To submit a permit, provide the following items.

  • Permit application
  • 2 plot plans
  • 2 construction plans - if the manufactured building is not in a manufactured home park

A permit is also required to build a Carport, Deck (over 30 inches in height) , Shed (over 200 square feet and 10 feet in height) , or Stairs (over 30 inches in height).

For clarification on the moisture content of wood framing members a faq document is available, click the link below. 

The moisture content of wood framing members form is on the last page of the temp rule link below.

Sample Fees

Sample Fees

Sample fees are provide for the following types of projects, see brochure below.

  • New single family house
  • Manufactured home in a park
  • Manufactured home on a private lot
  • Carport
  • Deck - Uncovered
  • Deck - Covered
  • Shed
  • Stairs