Well Field Control Structure Replacement

    • Project Type

    • Water Project
      • Project Name

      • Well Field Control Structure Replacement
      • Project Contact

      • Jason Wuertz
      • jason.wuertz@newbergoregon.gov
      • 503.554.1631
    • Project Description

    • Replaces the deteriorated and failing well house structure at Well #3 with a new structure that will provide and secure, environmentally safe, and flood protected shelter for the well control systems currently located in the existing well house.
      • Status

      • On-Hold
      • Project Budget

      • $110,000
    • Current Status Details

    • In design phase with James G. Pierson, Inc. Design is scheduled to be complete by the end of January with a design cost of $11,560.00.